New Construction Electrical
Design-build electrical for custom homes and major renovations in Los Angeles: service design, load calculations, rough-in, trim-out and inspections.
Learn moreService
Whole-house Generac standby generators with automatic transfer switches, sized to the load, permitted and installed by a Los Angeles C-10 contractor.
Buzo Electric Co installs Generac standby generators in Los Angeles, CA as a licensed C-10 electrical contractor, from load calculation through permit, gas and electrical coordination, and commissioning. We size the unit to your actual demand, install the automatic transfer switch, and integrate standby power with the rest of the home's electrical system. The outcome: when the utility drops, the generator starts on its own, the transfer switch moves the house to standby power, and your lights, HVAC, networks, and control systems stay up.
We install whole-house automatic standby power for high-end residential and commercial projects. The scope includes:
We start with the panel: service size, existing loads, HVAC tonnage, pool and spa equipment, EV charging, and anything on subpanels. We walk the site for generator placement, checking setbacks, gas meter capacity, and the conduit path to the service. This is where the generator gets sized correctly.
With the load calculation done, we specify the Generac model line and the automatic transfer switch that fits your service, whether that is a 200A whole-house transfer or a scheme engineered for 400A service. If the gas meter needs an upgrade for the generator's demand, we identify it here, before anything is ordered.
We pull the electrical permit as the C-10 contractor of record and coordinate the gas work, the concrete pad, and utility requirements. On new builds and renovations, we schedule this work with the GC so the generator rough-in lands in sequence with the rest of the electrical.
We set the unit, land the gas and electrical connections, wire the transfer switch, and commission the generator. Commissioning ends with a full transfer test: we drop utility power, watch the generator start and pick up the load, then restore utility and confirm the retransfer. You see the system do its job before we leave.
Standby generator cost is driven by a handful of concrete factors, and they vary by property:
Because every one of these is measurable, we quote from a site visit and a load calculation, not a flat rate. Request a quote and we will put numbers to your specific property.
Buzo Electric Co is a Los Angeles C-10 electrical contractor and integrator for high-end homes and commercial spaces. Owner Aaron Buzo leads the firm from our shop in West Adams, beside Culver City. We hold the license, run the load calculations, pull the permits, and do the installation; the same firm that wires the 400A service also programs the Control4 or Josh AI system it feeds. CSLB C-10 #1048529, bonded, with workers' comp.
We sell whole systems and whole projects: new builds, full renovations, estate upgrades, and commercial build-outs. Architects, GCs, interior designers, and AV consultants are as much our audience as the homeowner, and we communicate in their terms, including amperage, model lines, transfer schemes, and sequencing against the construction schedule.
Our footprint covers Los Angeles and the surrounding communities, including Beverly Hills, Santa Monica, Malibu, Pacific Palisades, Brentwood, Bel Air, West Hollywood, Culver City, Marina del Rey, Venice, Calabasas, Hidden Hills, and Manhattan Beach.
A standby generator is permanently installed, runs on natural gas or propane, and starts automatically through an automatic transfer switch when utility power fails. A portable unit requires fuel, cords, and someone home to set it up. For a generator for home backup that works unattended, standby is the category.
The right size comes from a load calculation, not square footage. We total the loads you want covered, including HVAC, kitchen, pool equipment, networks, and EV charging, then match a Generac model to that demand. A 22kW unit covers many homes; larger properties on 400A service often need more.
Yes, when it is sized to the full load, which is how we design most installations. Where the budget or gas capacity calls for a smaller unit, we engineer load management so priority circuits, such as HVAC, refrigeration, networks, and lighting, carry through the outage.
The transfer switch monitors utility power continuously. When it detects an outage, it signals the generator to start, then shifts the home to standby power, typically within seconds. When utility power returns and stabilizes, it transfers back and shuts the generator down.
Yes. A standby generator installation involves electrical work at the service and a gas connection, both of which require permits and inspection. As the C-10 contractor of record, we handle the permit and coordinate the inspections as part of the project.
Yes. We install Span smart panels and program Control4 and Josh AI, so generator status and load management can tie into the systems already in the house. One firm engineers the standby power and the integration, which keeps the design coherent.
If your project calls for whole-house standby power, call us or request a quote. We will schedule a site review, run the load calculation, and return a specific proposal: model, transfer switch, gas and permit scope, and how the work sequences with your build. Generac standby generators in Los Angeles, CA are an engineering decision, and we treat them that way from the first conversation.
Prefer to talk it through? Call (323) 252-7498 — a quick call is usually the fastest way to get a straight answer for your situation.
Where we work
Need generac standby generators? We're ready to help.
We work with your architect and builder to design and install electrical systems that work the way you want. Call to discuss your project.
Related
Design-build electrical for custom homes and major renovations in Los Angeles: service design, load calculations, rough-in, trim-out and inspections.
Learn moreLutron RadioRA 3 and HomeWorks lighting control with Sivoia motorized shades, designed, wired and programmed for high-end Los Angeles homes.
Learn moreDedicated theaters, media rooms and distributed audio and video for Los Angeles homes, with the structured wiring and network designed in from rough-in.
Learn more200A and 400A service upgrades, Span smart panels and subpanels for Los Angeles homes adding EV charging, heat pumps, pools, theaters or standby power.
Learn moreLevel 2 EV chargers and Tesla Wall Connectors on dedicated circuits, with the panel capacity and the permit handled by a Los Angeles C-10 electrical contractor.
Learn moreStructured wiring, enterprise-grade home networks, Luma camera systems and DoorBird entry, designed into Los Angeles new builds and full renovations.
Learn moreLandscape, facade and architectural lighting designed and installed for Los Angeles estates, with Lutron control so every scene is one keypad press.
Learn moreControl4 and Josh AI systems for Los Angeles homes: lighting, shades, climate, audio, video, cameras and access on one interface, programmed and supported.
Learn moreCommercial electrical and boardroom AV for Los Angeles offices, restaurants and tenant improvements, planned and built alongside the general contractor.
Learn more